In a staggered pattern.
Minimum roof edge details.
Download cad file download cad file.
Sika sarnafil minimum requirements detail drawing pdf pdf 190 kb.
Detail drawing pdf pdf 137 kb.
Two types of eaves one with a gutter and one with a copper edge strip are shown.
Roof slope of 1 4 per foot minimum is required on all roof systems.
The eave ends of the standing seam are formed and folded vertically.
Secondary roof drains are to be positioned on the roof so that water will drains to the primary upslope and they should not be installed at the same elevation as the primary.
Struction details illustrated in this manual depict wood nailers and blocking at roof edges and other points of roof termination.
Drip edge metal valley flashing dormer chimney and kickout flashing are types of roof flashing that shed water away from the connections between roofs walls chimneys and other building assemblies.
Alpine snowguard colorgard detail with décor profile.
Click to enlarge any image.
Slope should be built into the structure on new buildings.
Wood nailers must be adequately fas tened to the substrate below to resist uplift loads.
This especially is true at parapet walls and copings and roof edges where edge metal shapes are fastened to wood blocking.
Roof drip edge flashing at roof eaves gable ends.